Bertrand Creek Bridge

The Bertrand Creek Bridge Replacement Project consisted of the demolition and replacement of a deteriorated 2-lane precast concrete and timber crossing of Bertrand Creek on Highway 13 (264th Street) in Aldergrove BC.

Eurovia BC affiliate, Coquitlam Ridge Constructors was responsible for the supply and installation of a 70’ temporary 2-lane truss-panel detour bridge, planning and executing a creek diversion, planning and execution of demolition and disposal of the existing bridge, coordination of the pile driving subcontractor, and construction of the new cast in place and precast single span bridge structure.

Project challenges included working in a floodplain, extensive utility coordination, and working with a high traffic volume at the site.